O

PROJECT // 1. Lancaster Relief Storm Sewer Project



JEC’s responsibility included analyzing the existing storm sewer system and designing an improved storm system to provide adequate drainage for surrounding areas. Jaymark was involved in the following activities: created storm sewer schematics, developed detailed drainage area map, determined drainage parameters, evaluated existing storm sewer capacities, formulated alternative improvement plans, made final evaluations, and developed plan and profiles drawings for roadway, storm and sanitary sewer improvements.

PROJECT//  4. George Bush International Airport PN 621 Central Plant Upgrades Phases II and III Project


Responsibilities included civil engineering services to develop site plans for demolition, underground utilities, grading, paving, storm drainage, storm water pollution prevention plans, traffic control drawings and construction administration services for a new control building, cooling tower replacement and central plant upgrades. 

PROJECT//  3. Hayes Road Reconstruction Project 


The project involved the construction of a 40-foot wide concrete roadway with curbs, sidewalks, street lighting and necessary adjustment of existing underground utilities. JEC’s responsibility included analyzing the existing storm sewer system and designing an improved storm system that would provide adequate drainage for the surrounding areas. Engineering services provided for this contract included topographic land surveying, Limited Phase I Environmental Site Reconnaissance Study, Geotechnical Investigations, underground utility research and coordination with utility companies to ensure that all utilities are properly located on the construction drawings, roadway design on plan and profile sheets, cost estimates, governmental agency and utility company approvals, preparation of bid documents, bid tabulations and construction administration services.


PROJECT // 2. Fort Bend County Libraries-Sienna Plantation Branch

JEC provided structural analysis, detailed plans and specifications and construction administrative services for a 43,000 S.F. steel, concrete and masonry building.

Project// 5. University of Houston System - Parking Garage and Retail Center



JEC responsibilities included civil engineering services required for demolition and new construction of a 5 story parking garage with retail and office space.  Our work involved the design of sanitary sewers, water distribution system and paving and drainage design. Work further included:

 

Paving design for sidewalks and ramps.

 

Site grading.

 

Traffic control plans for water, sanitary sewer and storm sewer connections in roadway.

 

Developed a Storm Water Polution Prevention Plan.

 

Coordinated with other disciplines for project completion.

 

Designed wall footings as required per the Architect’s design

 

Designed median cuts on Calhoun Rd. to provide access to the new parking garage.



Project// 6. City of Houston Waterline Projects


Oakwood Area

 

Janowski Area

 

Junction City Area

 

Gulf Meadows Subdivision

 

Paul Quinn and Noble Subdivisions

 

South Union Subdivision

 

36" Water Transmission along Irvington Blvd.

 

Jaymark was responsible for providing preliminary engineering reports, plans and specifications, and cost estimates for the replacement of water mains for the City of Houston, Texas.  Engineering services provided for this contract included topographic land surveying, Limited Phase I Environmental Site Reconnaissance Study, Phase II Environmental Study, Geotechnical Investigations, water distribution system design on plan and profile sheets, cost estimates, preparation of bid documents, bid tabulations and construction management services.





Sienna_Plantation_Ranch.pngBUSH_IAH.pnglancaster_1.jpglancaster_3.jpglancaster_2.png004.JPGDSC03674.JPG

PROJECTS

Hayes_Road_%282%29.JPGHayes_Road_%283%29.JPGHayes_Road_%284%29.JPGFort_Bend_County_Library-Front.jpgFort_Bend_County_Library-Back.jpg